四虎免费最新在线永久4hu_国产成人无码av在线播放dvd_亚洲欧美另类久久久精品_国产a网_精品少妇av一区二区三区_国产精品伦一区_亚洲第一a在线观看网站_男女视频国产_国产色婷婷_亚洲综合影院

中文
Projects
Chongqing High-tech Zone Yanshan Avenue Project

The total length of the project road is 25km. It is an urban trunk road dominated by freight traffic, with two-way eight-lane. The design speed is 60km/h. The construction and installation cost is about RMB 7.5 billion yuan. The project is located at the southern foot of Zhongliang Mountain, with complex topographic and geological conditions. The project crosses with 8 mountain-crossing arteries, 4 tracks, 4 railways and 5 reservoirs, so the project is very difficult.


Back

Main Work Undertaken

JSTI adopts full-professional BIM design, and proposes solutions to adapt to complex construction conditions and functional requirements.

  

Innovation Points

The Project has broken through the engineering technical difficulties related to underpass operation expressway ultra-shallow buried tunnel, single-hole 4-lane large-section unsymmetrical pressure mountain tunnel, 6-way intersection 20-ramp large interchange, bedding slope geology 50m high slope protection, etc.

 

Achievements

1. BIM technology application in the design phase of Phase I (Bid Section II) of the core area of the mountain freight corridor (Xintu Avenue) won the Municipal Excellent Achievement Award issued by China Municipal Engineering Association in 2022;

2. Design and application of BIM technology in large-scale interchange project under mountainous terrain conditions-Taking the Phase I Project (Bid Section I) of the core area of mountain freight channel (Xintu Avenue) as an example, won the third prize of design group of the municipal BIM technology application contest in 2023.

 


主站蜘蛛池模板: 晋城| 乌什县| 西宁市| 丁青县| 洛川县| 霍城县| 天长市| 吉隆县| 镇雄县| 永康市| 资中县| 维西| 忻州市| 高阳县| 偏关县| 垫江县| 宜章县| 同江市| 大石桥市| 安新县| 阿城市| 沂水县| 南澳县| 类乌齐县| 确山县| 新余市| 鄂州市| 定日县| 神农架林区| 甘泉县| 麟游县| 大关县| 文成县| 舟山市| 荣昌县| 阿勒泰市| 同江市| 闽侯县| 西林县| 山阳县| 永寿县|